Risk register planner

Score each risk by likelihood times impact and rank them, with every owner and status kept in view.

Privacy: runs in your browser

This tool processes your input in this browser. Inputs and results are excluded from analytics. Draft saving is optional and stays on this device; delete saved text with the draft controls. Loading text from a URL is optional and contacts that server; its URL and your IP address are visible to the server. When a button sends your result to another tool, it waits in this tab until that tool opens it, for up to a minute, and is then deleted.

Copy link includes the inputs you choose to share in the address. Anyone with that link can reopen them. Files and generated results are excluded. Password and key tools share settings only.

Options and local file

Optional settings apply only to this tab.

Your result

JSON download

More
Keyboard shortcuts

Sharing and starting over

A copied link includes what you entered and your settings, so anyone with it can see them. Leave private text out. Files and results are not included; random draws are made again.

Start over puts the tool back to its starting values and closes any open file or device. Drafts you saved stay on this device until you delete them.

Risk register planner explained

Sort a risk register by a simple likelihood-times-impact score while preserving the owner and status of every risk. The two ratings are your ordinal scales from 1 to 5; the product is a way to order discussion, not a probability.

Next: JSON formatter

Worked example

Likelihood 3 multiplied by impact 4 gives a priority score of 12. A closed risk stays in the export but is not counted among open items.

Before you rely on the result

No universal severity thresholds or safety assurances are supplied. Agree what each rating means with the people responsible for the work. The register does not replace a domain-specific risk assessment.

Cite this page

ToolOctopus. “Risk register planner.” Updated . https://tooloctopus.com/risk-register-planner.

Add an access date if your instructions require one.

Citation formatting uses citeproc-js by Frank Bennett and Citation Style Language styles. License and source code.

Find a tool

Type a task, a unit pair, a sum or a time zone. ↓ to choose, Enter to open.